Managed performance

Protect performance after implementation.

G4U combines continuous diagnostics, optimization, Measurement & Verification and contract governance so improvements remain visible, actionable and accountable over time.

Triple SLABalanced outcomes
Energy & Water
Indoor Environment
Equipment Availability
Measurement & Verification

Savings become credible when the calculation history remains reproducible.

The performance ledger preserves the boundary, baseline version, reporting period, material changes, exclusions, calculations, uncertainty and approvals behind each published result.

Illustrative M&V ledger

Monthly performance statement

Frozen baseline894MWh · v3.2
+
Approved adjustment18MWh · event A-07
−
Actual842MWh · reporting period
=
Verified savings70MWh · 7.7%
Triple SLA

Performance is broader than energy alone.

G4U balances normalized resource performance with the indoor environment and the availability of explicitly contracted equipment.

01SLA 01

Energy & Water Performance

Normalized electricity, cooling, water and cost performance within the agreed boundary.

02SLA 02

Indoor Environment

Agreed temperature, humidity and service conditions in covered owner-controlled areas.

03SLA 03

Contracted Equipment Availability

Availability, unplanned downtime and recovery performance for explicitly listed equipment.

Boundary

Platform availability is monitored as a separate service KPI. Equipment and life safety remain non-negotiable operating constraints.

Operating rhythm

Performance is managed as a continuing discipline.

The service rhythm connects operational findings, formal evidence and management decisions without waiting for annual surprises.

01Continuous data-quality and fault review
02Prioritized Energy Actions
03Monthly M&V and performance reporting
04Quarterly management review
05Strategy and Model Pack governance
06Annual improvement and lifecycle roadmap
Commercial structures

A structure matched to verified feasibility.

Engagements can progress from a paid assessment to owner-funded implementation, performance-linked service or long-duration asset service.

90-day evidence3-year managed service10–20-year asset service where suitable
Your first step

Define the targets, evidence and responsibilities before performance settlement begins.

Review the assessment